Compressor trains and their drivers lie at the heart of LNG processes. Our consultant’s knowledge and operating experience of LNG facilities onshore and offshore (FLNG) cover every aspect of drivers and driven equipment, solutions to on-going problems and the cutting-edge technology that is progressing in the field.
Our familiarity with all types of rotating equipment within the LNG sector – including compressors gas turbine drivers Fr5,6,7, and 9, LM2500, LM6000, RR RB211 & Trent60, and more – enables us to
advise on most design and operational aspects.
With regards to Gas Turbines, the top demanded services are the selection process of the refrigerant compressor drivers and the technology qualification of new turbines for mechanical drive application. This is almost true for aero-derivative GT that are spreading in the LNG business.
The selection process has the aim to identify the optimum gas turbine driver for the process; it covers:
The technology qualification purpose is to identify risks, benefits, possible mitigations, fall backs and controls of novelty equipment, it includes, however it is not limited to , the review of:
The study is performed through a series of meetings at the equipment manufacturer’s facilities, visits and interviews with end users operating the assessed engines, and reviewing and cross-checking various design, manufacturing, testing, and packaging aspects. An important aspect of the review is to examine previous failures and design issues of the core engine hot gas path components, review subsequent failure studies performed by the OEM, and the remedies implemented in the existing and future engines.
The customer’s benefits from these services are the optimization of plant capacity through the correct selection of equipment duty to avoid under-sizing of over-design, the awareness of the novelty level of the selected equipment, the clear advanced identification of critical areas and risks and the mitigation actions needed over the project phases, and the awareness of the effective reliability and availability of the selected equipment.