For this turnaround project, MACH10 was asked to perform the role of inspector on the client’s team during the hot-gas path inspection of the GE Frame 7E gas turbines driving the propane compressor.
In the course of the project, the consultants were required to oversee and supervise the maintenance contractor during the execution of maintenance scope. This included opening of the gas turbine, replacement of the fuel nozzles, combustion liners and cross-fire tubes, replacement of the turbine first stage nozzles and blades, inspection of the remaining turbines stages, replacement of the casing bolt with Hytorc bolts, and package maintenance. All hot-section hardware was upgraded to Extendor Kit standard.
Confidential
Australia
2021
2-3 months