LNG Plant Critical Rotating Equipment Life Extension
22:25 13 April
in
[vc_row][vc_column width='1/2'] Our Customer conducted a Plant Integrity, Reliability and Remaining Life study for its LNG plant. The study covered high criticality process Rotating Equipment along with Gas Turbine and Steam Turbine generators. The equipment under review, were suspected to be at or close to its end...